Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 9.19am, Thursday 18th June, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Alsager |
Visitors to the Jim Evison playing fields park vehicles on the shared use cycle path - no deterrents (i.e. bollards)
Cycleway runs out at the Toucan crossing but it could be possible to extend the cycleway/lane into Wilmslow along Water Lane (which is a busy A-road)
Comments reflect the views of the original submitter only.