Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 11.07pm, Monday 10th August, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Alsager |
A523 from A555 to Poynton is a poor surface. Simply adding a cycle way to the side - which is long overdue - without resurfacing will relegate cyclists to a very poor surface. Resurface then segregate.
Comments reflect the views of the original submitter only.